Saturday, 11 January 2025

Chilly start to 2025

Friday 10th January saw Georgie & John Wood shunting PWay materials from Boat of Garten to Broomhill  


after much clearing of snow from switches etc John's photo.
--------------------.

Saturday 11th didn't see the planned start of work at Broomhill for obvious reasons. On our arrival at Boat of Garten it was minus 16.5 Celsius! Loco needed a wee jump start and plan B eventually swung into operation -


retrieving all the broken fenceposts, old fencing wire and ryelock that Fergus (top right) our fencing contractor had neatly piled up after doing a lot of fence renewals 


between Boat of Garten and the Dulnain bridge, of course we had to push the previous days positioned vehicles onto the extension with us, after freeing the frozen brake blocks!



On the way back Georgie had us clearing vegetation around level crossings and bridges.  Ian's two thin photos. 
Thanks to Mike, Ian, Andrew, Fergus and Georgie.








    



 



 

PWay Annual "line Inspection" - October 2024



Saturday 19th October saw the PWay squad have our annual relaxed inspection of the line.


 On the 1230 Aviemore departure we had soup & sandwich light lunch courtesy of Strathspey Railway Catering Department in the TSO and very good it was too! As it transpired that was just a starter, as we somehow managed to get some complimentary bottles of beer and later on the 3pm departure, fish & chips from Smiffy's in the Observation Saloon courtesy of Strathspey Railway Company (SRC) as above. 


And on the return from Broomhill we had a good view of the loco workings. In years gone by we would all have then adjourned to a local hostelry but maybe next time.....
Thanks to SRC and all that managed to attend.

----------------------------

    

Later in October the switch into road one at Aviemore Shed


was finally reinstated.
Apologies came across the above as draft only, thought i had published