Friday, 23 May 2014

More Fishplate oiling - Wednesday 21st May

 
Glad to see the old girl back in service, Fishplate oiling continues a pace, had reached Estate level crossing near 85 1/2 milepost crossing by lunchtime of May 21st. I think the intension is to complete all the plain Mainline of the railway by "summer".
 
 
The old water tank site at Boat of Garten is now cleared, with the new tank top right. Gradually the environs around Boat are being tidied up, will try and get a photo of old coaling point by the South Signal Box.
 
 
Another project Ray (pictured) and Colin are heavily involved in, is the painting of the self propelled 12 tonne Rail Crane into PWay green, which found some brief space in the C&W repair shed. As Colin said only the jib to do!

Monday, 19 May 2014

Jacker Packer and Fishplate oiling - May 17/18

 
 
Good progress was made on Saturday 17th on packing the extension from Broomhill, with the Jacker Packer, until one of the hydraulic hoses burst, quite spectacularly I believe. Hopefully it will not take too long to source a replacement.
 


On the Sunday it was back to routine maintenance in the form of fishplate oiling, starting from 87 1/4 milepost working towards Aviemore. The "Race the Train" event passed below us with some shouts of "please can you delay the train for us?
 
 
 
46512 with a floral tribute to Graham Elkin, who sadly passed away recently after a long illness.
 
 
 
Working in three pairs meant that good psychological progress was made as we progressed six lengths at a time and I guess about a mile and a half was achieved.

Sunday, 27 April 2014

Another long term project nears completion.

Driver Scott topping up 46512 at Boat of Garten
 The old water tank having been removed, the previous day.
Anyone fancy a 40+ ton game of  "Jenga"!
 
 
 
 

                             Out with the old in with the new. 

The full story and due thanks to all those involved will no doubt appear in the next edition of
 Strathspey Express. I wonder how long it will be before the S&T Dept get round to commissioning the attached signal and associated interlocking?  

Thursday, 24 April 2014

Midweek Fishplate oiling 24/04/14

click to enlarge
 
 Today we started the Springtime Fishplate oiling at Boat of Garten Down Home signal, heading towards Aviemore, we were advised that we were to do the outside-nuts and here's me thinking we ARE the outside-nuts! To explain that each 60foot length of rail is joined to the next with a fishplate with 4 nuts and bolts, which need to be partially unbolted sufficiently so that we can pour track lube onto the fishing surfaces of the plates to lubricate them to allow for expansion/contraction of the rail. Then bolt it all up again so that it's all tight, the nuts alternate at each joint, so every 120feet needs to be done, only 5miles to do! this is not the most exciting job on the Pway but passing traffic and the wonderful weather kept us amused, in total we managed about 3/4 of a mile.
 
 
 
11.04 Royal Scotsman ECS move to Aviemore 
 
 
 
 1.10 Broomhill- Aviemore pass the "squad"
 
 
 
I believe that tomorrow the old water tank is to be removed by the rail mounted 12tonne crane, so next time I am down there should be a space here.


Wednesday, 23 April 2014

PWay on Dulnain Extension 5/6 April 2014

Click on Two "Muscle" Men, one wearing their high-viz in an unusual way! photograph to enlarge
Two "Muscle" Men, one wearing their high-viz in an unusual way!


The  trusty "Muscle Man" has served us for years of trouble free use and is used to slew the track horizontally.

Click on photograph to enlarge
With Georgie up high in the Road-Railer doing the sighting



  
The star of the show must be the recently fully refurbished/serviced "Jacker Packer", which hydraulically lifts the track and squeezes the ballast under individual sleepers and don't worry it does need copious amounts of ballast fed to it, just to keep us fit you understand! another 200 Tonnes on order I believe.


Click on photograph to enlarge
The Jacker Packer in action


Wednesday, 5 March 2014

Bridging the Dulnain

To start off the new P-Way Blog for the Strathspey Railway, here is some rather late news!

On the weekend of the 15th February 2014 some very visible and significant progress was made as can hopefully be seen from the photos below. Please note that the rails on the bridge are temporary and will be used to assist in the placing of the final 10 cross beams, even the huge crane used could not reach far enough to put them in place.

The Colas crane arrives at Broomhill


The first girder is lifted off the wagon



Taking the girder for a walk
 
Finally bridging the gap

Both main girders secured

Fitting the cross-beams


Temporary track has been laid to install the remaining cross-beams.  The Colas crane doesn't have enough reach to install cross-beams all the way across.
 

Deep thought...