Monday 22 December 2014

More Bridge work 20/21st December 2014

 
First task on Saturday was the clearing of snow and ice from the Down platform at Boat of Garten, finally proclaimed safe once the first packed Santa train of the day had arrived.
                             
 Thereafter the small squad proceeded to the River Dulnain. Now that the rails are on the Bridge the approaching track was ramped up to Bridge Rail Level, by packing of the ballast under the sleepers and finally all tidied up. I believe there were some aching under used muscles located subsequently - you deserve a guilt free extra mince pie over the festive period!

An old view taken just under a year ago, showing the route to Grantown.
  
A fresh squad on the very wet Sunday- cut out, lifted and turned the temporary wooden decking boards, so that they are now on top of the cross members running parallel to the running rails.
 
Apologies for lack of photos during work - inclement weather and short daylight hours, will try and add some later of what the small but very hard working squads achieved.
 

Mike sent in this unattributed, even more historic photo, looking towards Grantown sometime prior to the lifting of the track by the looks of it.

I thank you all for your support (armchair included) and wish you all a Merry Christmas and hope to update you on PWay activities in 2015.
 
 
 
 
 

No comments:

Post a Comment