Monday 14 November 2022

More Sleeper pre-drilling - Saturday 12th November 2022

Saturday saw good progress in fine, warm even, weather.


Michael, David, Martin, Angus and Mike got through all the sleepers laid out on Boat of Garten back platform line but as Georgie was picking them up loading and carting them to site, an exact count was not done but reckoned around 130 sleepers, only possible by the use of two drills. Stabled in the background is the hired in Road Rail Vehicle that is in use at Dalfaber level crossing site below,


with much work necessarily being done on nightshift.
Thanks to Mike for info/photo and Stephen Muirhead for night shot, showing new rails/sleepers now in situ.  

 