Dislodged & loose small pieces of sandstone cladding below the walkway at the Boat of Garten Nethybridge Road under bridge were made safe on 30/17/7 by Mike Tough. Until such time as 2  other potentially loose sandstone pieces were removed a temporary speed restriction was imposed. This was done on 4/8/17 by Ian Stanworth & Mike & the restriction lifted to the relief of the footplate crews. Other minor repairs to coping stones are planned.
 
 
Ray Kenyon and Colin Frost did some painting over 24/25 July of the gates by the Engine Shed at Aviemore. 
 
 
 
Above before
And after
 
The new board holding the signs on the middle of the gates has been made, and painted by Jack in the carriage shed and will be fitted to the gates when completed. Thank You to Colin for information and photos and as he says "improved kerb appeal". Another painting job was started but I will save it for the completion photos.
 
As per my last Blog the PWay Squad finished fishplate oiling at the 89 milepost, or so we thought, during a subsequent weekly Track Inspection, I noticed one spanner, one oil can opposite the 89&3/4 milepost and that the fishplate oiling had been completed up to that point. A big thank you to the unknown Warrior.
 

Today's Soldiers above - left to right John Wood, Andy McClintock, Ian Stanworth, Mike Tough, Roger Snowden, Ben Tyrell and Neil Howie (who took the photos and info) managed to complete an amazing mile and a quarter.
 

Glad to see Ben is still smiling as they approach Tullochgorum Bridge where they finished for the day.
 
 
 
 

 

 