After working the empties to Aviemore on Thursday and then loading them with spent ballast from Network Rail Aviemore 2018/19,
the socially distanced, full train load seen here approaching the Summit between Aviemore and Boat of Garten,
where the train is run round to propel to Morley's
and be offloaded by the recently acquired Colmar Road Rail Vehicle operating on the new siding, utilising the very useful clamshell bucket
and depositing the ballast into the sleeper beds of the shed road preparatory to lifting the track to its final level.
At this rate the PWay Squad will be getting their P45's!
Good to see the Colmar at work at last!
ReplyDelete