Wednesday, 18 November 2026

Rails lifted at Boat of Garten Up line - Wednesday 18th November

Today saw visible progress at Boat of Garten Station.
   

Our 12 tonne self propelled rail crane easily lifted the rails out the way into the down line four foot, 



until it was no longer able to self propel! Tyler then used the class 37 to shunt it about, with Nathan operating the crane, John being the Slinger, Georgie the Bankswoman and Nigel running up & down the platform keeping an eye on his master!


John reports that he also refurbished another 72 CS1s and dismantled the foot crossing.
Many thanks to all, especially John who kindly took the photos. 

 

Sunday, 15 November 2026

Onto another CS1 Relay - 14th November 2026

Sunday 6th November - Richard and Bob Faulkner were commandeered into assisting Georgie mark the rail levels and measuring offsets in the up loop line at Boat of Garten Station (where the Royal Scotsman charter train is often stabled overnight) for the forthcoming relay.

Subsequently the fishplates and keys removed I think by Richard & Fergus on Friday and placed out the way on the down line, as above.

----------------------------

Saturday 14th November - The plan was to be lifting out the up line rails, alas apparently our 12 tonne rail crane needs a new starter motor....


So for starters, Georgie had us removing the switch plates from the hardwood timbers that will be re-used elsewhere.


Once metalwork removed, timbers rotated and wooden plugs hammered in, some needed sharpening to ease them into the small holes - boys with their toys!.


The rest of the day was yet again refurbishing CS1 chairs - mostly consists of unscrewing nuts, oiling threads & tightening again, a few needed new rubber pads and


fortunately even fewer needed a new bolt, as rotating concrete sleepers wasn't easy - but impossible when rails in! (which is the whole point of doing this task now). Just visible on right is the discarded old one but Richard had bolted off to his next task before I could get him in shot!


Up line on left looking towards Aviemore from footbridge


and looking towards Broomhill, in distance can be seen the refurbished concrete sleepers which Georgie took from us by machine and placed them for easy access when coming to relay them proper.
Many thanks to Richard, John (and his toys), Fergus, Iain, Mike and of course Georgie 








 





  






  
 

Friday, 6 November 2026

More Granish ballast tidying - 6th November 2026


Same as last week, and a few different faces - Roddy, Fergus, Mike, Alan (who joined us for the first time) and Darwin who came up from Perthshire. 


Sleeper spacing noted to be better as practice had made perfect by this time and we used spacers to lay them out late last year. In the distance can be seen where Georgie still needs to dig out the four foot and it still needs her magic touch to tidy the shoulder but she had to go to a budget meeting - which we utilised for an early finish, as there was no passing traffic to give us a break and we had a long walk back!
Many thanks to all that slaved away.





 

Sunday, 1 November 2026

It's been a while and we're still at Granish! - 31st Oct 2026

It's been a while and we're still at the Granish Relay!


Squad met at Dalfaber Industrial Estate and procured our tool of choice from the back of Georgie's truck and we proceeded to worksite - the Granish Relay - which is finally at the ballast tidying stage.


We managed a good few lengths to Georgie's satisfaction and I guess we are about half way, on finishing, walking back it was noticed some sleeper spacing is a bit irregular, we blamed Richard as he wasn't there!
Many thanks to Georgie, Mike, Fergus & Iain R