On Saturday- Large squad assembled at Boat of Garten and proceeded by car to the worksite at Drumullie, which is about a mile further North.
 
 
We welcomed Gavin who is armed with shovel in the "four foot" (between the Rails), being his first time I hope we did not over work him! as believe, after doing the Measured Shovel Packing at the dipped joints some slewing of the rails was carried out and finished off by shovelling a lot of ballast at the Level Crossing for safety reasons. Thanks to John Wood for photo & Info.
 
On the Sunday Myself, Andy and another New face Iain, lubricated the slide chairs of all the points at Boat of Garten and Aviemore, this was made easier as all the Signal Boxes were Staffed and the Points were quickly reversed when the Signallers were asked to do so, thank you Guys.
 
 
    
Above Iain doing slide chairs on a set of Hand Points at Aviemore. 
 
In the afternoon, once we had obtained the requisite surplus bearing oil from the Engine shed and a suitable dispenser, we then oiled the mechanisms of all the hand points.
 
 
Sure Iain was desperate to glance up at 46512 departing Boat of Garten!
 

A rare sighting of the S&T Department (Signals and Telegraph) at work! They had the audacity to complain that the New Water Tower is not positioned correctly, as it complicated their new signal wire lines, for the new signal attached to the water tower.
 
 