Another Friday was organised so that some more lifting and packing could be done whilst no service trains were running. Fergus was cajoled into being the Jacker Packer operator and bravely agreed, as Ian was away, by the time he got into the swing of things a hydraulic hose sprung a leak and the job was stopped early afternoon.
Mike foreground, Andrew and Bob (who took the photo) all assisted in manually packing the sleepers either side of the joint that the Packer cannot do due to the fishplates getting in the way of the railhead clamps. All, including Bob's dog had an early long walk back to Boat of Garten as Georgie was called away to Dalfaber Level Crossing, leaving the class 27 and messvan on site.
Thanks to all that participated.