Following on from previous at Aviemore Running Shed - the East Pit floor
Shuttered and reinforcing mesh ready for concrete, taken by Mike Thursday.
Alex Walker the Builder in paradise.
Ian took Alex at speed (time is money!) as well as the 12.5 cubic metres of concrete
Job done for East Pit.
Thanks to Alex and Ritchies Aviemore and all that attended and watered afterwards to prevent cracking during curing process.