Saturday, 2 March 2024

More digging and much more at Broomhill - 1st & 2nd March 2024

A few of us had a Friday off work, so where else would we go for fresh air and exercise!


Rare photo above (Richard, Ian, Michael, Roddy) Michael actually working!!! Possibly with the encouragement of Ian. In the glorious sunny morning digging out the switch and crossing was completed.


And after a rather smoky lunch, we had digging out the remainder of the plain line to look forward to, in the event it was easier than anticipated, as the wee clamshell bucket saved us a lot of heavy digging, although we were getting rather tired, Ian and Richard with Georgie sighting marked out the new alignment. Roddy took above arty photo - showing the soon to be replaced naked wooden Mills Clip track panels


 Richard above then finessed the new rails into position with the help of the Colmar and Georgies skillful operation. 

Thanks to all that attended.

--------------------------

On Saturday, 2nd day of meteorological Spring, the drive up the A9 to Broomhill didn't exactly fill us with glee!


As captured by John in Ian's car, who met up with  Angus, Mike, Martin, Fergus, Richard, Iain, myself and Georgie at an altogether more balmy worksite.


Above showing existing alignment, proposed is just visible - red ground mark and new rail will be the position of sleeper ends. 


Think it was two plain lengths of Mills clips removed, rail dragged out, then sleepers man handled so that Georgie could reach with Colmar. 


Then unscrew catch points and remove to PWay train in loop.


Then a couple of lengths of the dreaded elastic spikes, each time Georgie went to the train with redundant material, she came back with required components in the grab.


A lot of unscrewing required on actual switch and crossing, which was finally dismantled and removed after half of us had left site.

Yet again thanks to the many that turned out and I hope Georgie was pleased with progress!












No comments:

Post a Comment